Title

Subtitle

1/350 ST:TMP Drydock (pt II)

09/22/08

« Back to Album Photo 11 of 61 Previous | Next
09/22/08
The travel pod interfaces are in place along with the underneath details. Next, I'll add the pod airlocks and the lighting and wiring.
Posted by nemvia on January 30, 2009 Full Size| Slideshow

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

Already a member? Sign In

0 Comments