June Updates - 2018 https://www.nemvia.net/apps/photos/ June Updates - 2018 Display Stand - 1 Just in case anyone missed the las update I added the black velvet underneath the dock to help with the illusion of the dock floating in space. https://www.nemvia.net/apps/photos/photo?photoID=205122238 205122238 Enterprise Armature - 1 Here the Enterprise Armature is finally bolted in place and all of the ships lighting effects wiring are run up thr side and top of the Armature which will later be covered. https://www.nemvia.net/apps/photos/photo?photoID=205122239 205122239 Enterprise Armature - 2 Another shot of the ship appearing to float in the dock. https://www.nemvia.net/apps/photos/photo?photoID=205122240 205122240 Enterprise Armature - 3 From a little further back. This is just before I added the port side panel frame assembly. https://www.nemvia.net/apps/photos/photo?photoID=205122244 205122244 Enterprise Armature - 4 Here is a close-up of the wiring for the ship. I still need to run some of the dock wiring through this armature before it is sealed up. https://www.nemvia.net/apps/photos/photo?photoID=205122237 205122237 Enterprise Armature - 5 To hold all of the wiring in place I just used electrical tape and I fed the wiring through either side of the hole for the armature. https://www.nemvia.net/apps/photos/photo?photoID=205122242 205122242 Port Side Panel Frames - 1 Here the Port side panel frames are mounted into the overhead module assembly. They are a little bit out of alignment for now but I need to add the support screws from the display stand. But, the Enterprise is now encased inside the dock. https://www.nemvia.net/apps/photos/photo?photoID=205122243 205122243 Port Side Panel Frames - 2 And finally the dock looks the way it should. Now to get to work on the work cranes, work lights and the main lighting as well as the main switch board. See you next update. https://www.nemvia.net/apps/photos/photo?photoID=205122241 205122241